If you want bulk purchase, please contact us.
DDP
Depend on quantity
DAP
Depend on quantity
DAT
Depend on quantity
![]() |
DaeSeung Industry is the specialized company that produces the insulation materials such as Polyethylene Foam Materials, XPS(Expandable Polystyrene Materials) and other functional insulation(Thermal reflective materials, Interior and high temperature performance materials) what are used primarily in construction industry. In line with the Zero-Energy Housing policy, which is already recognized as the best performance product from customers in various countries through continuous research and development and continuous investment. Daeseung Industrial already has various quality management, eco-friendly certificates, technology and management certificates related to product performance, and is also expected to acquire the international quality certificate UL mark in June 2021. |
![]() |
Air PinkEAN |
Air Pink AirPink is a extruded polystyrene foam insulation developed by Airlon, through its own research and development process. The excellent advantages of this product is that it has high performance like a |
![]() |
• Thermal Insulation Properties • Self-Extinguishment • Waterproof & Moisture Resistance • Construction Ability • Corrosion Resistance • Eco Friendly Application • Apartment, OfficeTel, other Building' Inner Wall, Out Wall, Rooftop • Ice-Rink, Floor of Sport Center, Frozen Storage, Refrigerated Tower Cars • Cattle Shed Properties Only items in red square box are produced. |
![]() |
※ ↑ : Above / ↓ : Blow Product Size, Type |
![]() |
How to Use Construction Method of stacking in Double-Space(Between Wall) |
![]() |
• Stack an Inner Wall At this time, insert #16 wire into a u-shaped bend-ing on the bottom for AIRPINK fixing between the inner and outer wall. • Stack the AIRPINK by securing it to the fixed liner that already buried. Avoid bending and crevice between AIRPINK boards. • Tape the joints between the AIRPINK with a damp-proofing tape. Fill the gaps thoroughly with AIRPINK pieces and then tape them. • Stack the outer wall with fixing it by buried wire Construction Method of Dry Exterior Wall |
![]() |
• When concrete casting on the wall, install a steel anchors for fixing AIRPINK board to the outer surface. • Hang the AIRPINK board on the anchor. At this time, be careful not to be bend the AIRPINK board, especially to make sure that the joints between the AIRPINKs are adhered to. • Hang a finish materials like an panels, marble, etc. on the anchor and stack them. Construction Method by Bonding Adhesive (Composite Insulation Panel) |
![]() |
• Make a laminated Panel gathering AIRPINK and gypsum board. (Thickness 9mm) • Remove any dirt or blemish from the wall where the panel will be attached. • Cut the panel to the fit the height and space of the wall. • Attach the bond at intervals of 300mm with a diameter of about 50mm and a thickness of about 3~5cm. • Attach the panel so that it is horizontal. At this time, a concrete nail is placed and fixed so that the bond can be supported until it is completely hardened. • Finish the seam with gypsum bond. Construction Method of Roof Insulation (1) |
![]() |
• Place the AIRPINK on floor after making dry the slab surface on the roof. • At this time, be careful not to widen the gap between the AIRPINK boards. • Apply a moisture-proof tape between the AIRPINK boards. • Construct waterproof(rubber) x-layer. Cast the concrete into the designed thickmess and finish it. Construction Method of Roof Insulation (2) |
![]() |
• Construct waterproof(rubber) x-layer after dry the slab surface on the roof. • Place the AIRPINK on the waterproof sheet • At this time, be careful not to widen the gap between the AIRPINK boards. • Apply a moisture-proof tape between the AIRPINK boards. • Cast the concrete into the designed thickmess and finish it. Ice Rink Floor Construction |
![]() |
• Flatten the floor with mortar evenly on the concrete surface. • Place a waterproof sheet on the mortar. • Place the AIRPINK on the watereproof surface to fit the it's thickness. • Place a waterproof sheet on the AIRPINK boards. • Cast the mortar evenly on the waterproof sheet. • Cast the lightweight concrete after plumb the cooling tube, according to designated plan and finish it. Precautions for Construction • This product can be used for heating and cooling at temperatures below 70℃. • In case of exposure from heat waves and direct sunlight may cause discoloration or deformation of product. • Do not store the product on the steel, closing a fire and heat-absorbing materials. This can also cause product discoloration or deformation. • When finishing interior materials, construct the fire protection or heatblocking walls together. • Please consult our technical institute(R&D Laboratory) for other purpose other than the designated use. ⇒ a Shape of Assembly When installing the product, it is installed in an edge shape to prevent heat loss caused by heat passage and leakage of the joint. |
![]() |
Precautions for Storage • Keep the product in a well-ventilated space without being affected by snow, rain or moisture and etc, and cover it with a tent (similar mat) when storing outside. • To prevent damage, store it horizontally using a pallet, etc. • Work inpairs to avoid damaging edges and surfaces during handling and transportation. • Do not place heavy objects on the product, as this may cause product damage. Warning • Wear protective equipment such as eye protection, helmet, dustproof mask, gloves, etc. Dust inhalation can cause irritation in the respiratory tract. • If dust comes into direct contact with skin and eyes, do not rub and wash thoroughly with soap and water. • Don't work on the product. • If exposed to fire and high heat (artificial point: 370 ℃) it may be burned, so be careful. • Don't use it as a riding stuff on water in summer, accidents may happen. • During handling and construction, if any abnormalities occur in the body, seek medical advice from a doctor. Certificates and Test Report • Quality Control System Certificate |
![]() |
• KS Certificate Government Agency : Korean Standards Association The contents of certification : Extruded Polystyrene Foam |
![]() |
• Korea Eco-Label Government Agency : Korea Environmental Industry & Technology Institute The contents of certification : Extruded Polystyrene Foam |
![]() |
Certificates and Test Report KCL(Korea Conformity Laboratories) • Quality Control System Certificate Government Agency : Korean Standards Association The contents of certification : Extruded Polystyrene Foam |
![]() |
• Quality Test Report Government Agency: Korea Quality Institute of Construction Industry |
![]() |
Cases |
![]() |
The person in charge
Seung Yong ShinAddress
166 Saejae-gil Gonjiam-eup, Gwangju-si, Gyeonggi-do (12724)Please enter the text on the left image to prevent automatic input.
0 / 4000