Quote Inquiry
FOB
Depend on quantity
Technical Consulting • Engineer : E&I, Piping, Outfitting, Mechanical. Structure • Inspector : Structural, Coating, Electrical, Mechanical, Painting • Office Administration • Expart Personnel |
|
Plant Design • SACS for stress analysis, Nastrom FX for FEM analsis, Inventor for 3D design - Detail DWG - Production DWG • Oil&Gas, Chemical Plant Power Generation |
|
Offshore Design • Offshore Design • Consulting & Supervision • Ship Design, Offshore Engineering,Production System, Ship yardlayout • Engineering Team Organization - Structure: Structural Analysis, Basic&Detail Drawing, Shop Drawing, 3D Modeling |
|
Trading Service In 2019, GOGS took over Daesung trading company which has been engaged in import and export business since 2002, supplies outstanding tools and materials of Korea to state-owned shipyard in China such as DSIC, BSIC, XINGANG, BOHAI, SWS, HUDONG and COSCO etc. Moreover, it is not only focusing on export increase but also on the import of Chinese equipment and consumables. • Main items of export GOGS has been registered to state-owned shipyard in China (DSIC, BSIC, XINGANG, BOHAI, SWS, HUDONG, COSCO etc.) as an agent maker and trying to find excellent material and shipbuilding industrial equipment including the following items • Main items of import Following products have been passed the self quality, price, A/S verification system among the makers that supplied to state-owned shipyard in China. |
|
SHIP DESIGN • BASIC / DETAIL DWG • PRODUCTION DWG • Oil Tanker, Bulk Carrier Chemical Carrier, LNG Container Ship, Supply Vessel WBTS(Water Ballast Treatment System) |
|
ETC. • Consulting & Supervision • Ship Design, Offshore Engineering, Production System, Shp yard layout • Engineering Team Organization - Structure : Structural Analysis, Basic&Derail Drawing, Shop Drawing, 3D Modeling - Piping : P&ID, Arrangement, Installation, Fabrication, 3D Modeling - Outf.&Mech. : Vent Diagram, Machinery Room, Mooring Anchoring, Life Saving, Arrangement, Installation - E&I : Elec. Diagram, EL. Load Analysis, Arrangement, Installation, Fabrication - Accommodation : HVAC&Architecture, Diagram, Arrangement, Installation, Fabrication - Production : Block Division, Production Method, Lifting Method, Scaffoldingm Consulting etc. • Manpower Structure |
The person in charge
Bong Geun LeeAddress
456-7 Suyang-ro, Geoje-si, Gyeongsangnam-do (53237)지오지에스
Please enter the text on the left image to prevent automatic input.
0 / 4000